Project controls start before the first estimate
Most of a project’s cost and schedule is decided before anyone opens Primavera P6. If controls arrive after that, they can only measure the damage.
Read
How our controls professionals think about schedules, cost, risk and the truth behind the numbers.

Most of a project’s cost and schedule is decided before anyone opens Primavera P6. If controls arrive after that, they can only measure the damage.
Read
A coin-flip date dressed up as a commitment is the most expensive number in capital projects. How to read a QSRA, and how to size contingency you can actually defend.
Read
In an occupied hospital, the schedule is not a construction document. It is a clinical one. Five rules for controlling work next to patients who cannot be moved.
Read
Open ends, hard constraints and float that never moves. The DCMA 14-point check will not fix a schedule, but it will tell you when to stop believing it.
Read