CPM scheduling, cost control, earned value, risk, change and claims for owners of complex capital programs. We show you the slip while it is still float, not after it reaches the board.
- SPI
- 0.96
- CPI
- 1.02
- Float left
- 15d
Projects rarely fail on site.
They fail in the numbers
nobody checked in time.
The slip starts as float.
A late delivery rarely moves the finish on day one. It eats float quietly, until the critical path flips and the date goes with it.
Optimism compounds.
Every update that rounds progress up borrows from the next one. By the time SPI reads 0.85, the cheap recovery options are gone.
Clarity is a discipline.
Independent updates, earned value and risk analysis give leadership defensible data while there is still time to act on it.
- 2021
- Founded in Newark, NJ
- 14
- Controls capabilities
- 22
- Markets served
- 4
- Sectors
One late delivery. Watch it travel.
A sample arena schedule, eleven activities, real critical path math. Pick an activity, make it late, and see where the float goes and what the delay costs.
- Opening night
- Day 230
- Finish moves
- 0 days
- Float absorbed
- 0 days
- Revenue at risk
- $0
Scoreboard and AV delivery has 15 days of float in the baseline. Add days and watch it disappear.
Plan it. Control it. Prove it.
14 capabilities in four groups. Bring us in before the first activity is drawn, or the week the dates stop holding.
- Integrated Project Controls
- Cost Management & Control
- Earned Value Management
- Change Management
- Schedule Review & Assurance
Proof, in the numbers.
19 confidential engagements across healthcare, infrastructure, energy and development. Clients stay private. The results do not.
Hospital Imaging & Clinical ExpansionSchedule and cost control for a phased imaging and clinical expansion inside a hospital that never stopped admitting patients.
Media & Performing Arts CenterCost control and change management for a donor-funded arts venue where every dollar had to be accounted for in public.
Live-Events ArenaA full controls team embedded on an arena build that had an opening-night date sold out before the steel topped out.
Secure Federal Operations FacilityAn EVMS-compliant baseline and monthly performance reporting for a secure federal facility under strict agency oversight.
Managed Lanes CorridorMulti-contract schedule integration for a tolled managed-lanes corridor built under live traffic.
Airport Operations & Baggage ProgramProgram controls for an operations center and baggage system upgrade delivered without a single missed departure.
Hyperscale Data Center CampusWeekly forecasting on a data center campus where every week of delay was measured in lost megawatts.
Battery Energy Storage PortfolioQuantitative schedule risk analysis across four storage sites racing interconnection and tax-credit deadlines.
Yusuf BalogunFounder & Chief Executive OfficerExceptional project delivery goes beyond schedules and budgets. It is about transforming complexity into clarity, uncertainty into confidence, and strategic vision into measurable results.
Strategic Vision. Precision in Execution. Excellence in Delivery.

Your forecast is a promise. Let’s keep it.
Share the program, the budget and the date that matters. A senior KonradBeck controls lead will come back to you within one business day.