Project controls since 2021 Scheduling · Cost · Risk · Advisory · Newark, NJ CareersNewsroomJoin our benchProject map
Development · Student Housing

Move-in weekend will not wait.

Schedule assurance, risk analysis and cost control for on-campus residence halls and purpose-built student housing. We find the slip early enough to save the weekend every student arrives.

What is really at risk.

01

Miss August, lose a year

A building that misses move-in often waits a full year for its next full lease-up.

02

Beds are leased before the roof

Units are pre-leased months ahead. Owners need dates they can promise to students and parents.

03

The finish is crowded

Inspections, furniture and access systems all land in the final weeks. Schedules that compress them hide the real risk.

Student Housing

Where we add control.

  1. 01

    Off-campus communities

    Bed-by-bed leased buildings with fixed move-in dates.

  2. 02

    On-campus residence halls

    University projects on active campuses with academic calendar deadlines.

  3. 03

    Living-learning centers

    Housing combined with classrooms and dining, each with its own opening needs.

  4. 04

    Summer renovations

    Life safety and systems upgrades packed into the gap between terms.

How we control it here.

The KonradBeck capabilities owners in this market call on most.

Schedule Review & AssuranceControl

Monthly schedule audits that test logic, float and progress against move-in.

Risk ManagementPlan

Risk analysis on move-in weekend, with mitigation ranked by effect.

Planning & SchedulingPlan

Detailed finish, inspection and furniture sequences loaded floor by floor.

Owner’s RepresentationAdvise

Owner-side oversight for universities and private student housing developers.

In practice · Student Residence Village

1,020 beds, move-in weekend held.

Monthly schedule audits on a student residence village flagged a slipping critical path months before move-in. Because the warning came early, the owner and contractor had time to resequence the work and add resources where they mattered. Move-in weekend held.

1,020
Beds
Monthly
Schedule audits
2023
Engagement year

Questions owners ask us.

What does a monthly schedule audit include?

A logic and float review, a DCMA 14-point check, progress verification and a short note on what changed and what it means for move-in.

How early can you see a move-in risk?

Float erosion on the critical path usually shows months before the date. Our audits are designed to catch it then.

Do you work for universities or developers?

Both. We support universities, private developers and their partners on on-campus and off-campus projects.

Student Housing

See your student housing program clearly.

Share the program, the budget and the date that matters. A senior KonradBeck controls lead will come back to you within one business day.