Waterfront Residential Tower
Developer-side schedule and cost oversight on a tower financed against a fixed completion date.
- Owner
- Confidential
- Location
- U.S.
- Market
- Multifamily
- Our role
- Owner’s representation
- Scale
- 380 units
- Completed
- 2025
Developer-side schedule and cost oversight on a 38-story tower financed against a lender-approved completion date.
The construction loan carried a completion date and a cost-to-complete test the lender checked every month. A slipping facade package or a cost overrun could put the loan out of balance. The developer needed independent eyes on the contractor’s schedule and pay applications, and a forecast it could put in front of the lender with confidence.
The approach.

- 01
Independent schedule reviews
We reviewed each monthly schedule update for logic changes, float erosion and optimistic durations on the facade and elevators.
- 02
Pay applications checked
Every pay application was checked against measured progress before the developer signed it.
- 03
Cost to complete, every month
A monthly cost-to-complete forecast kept the loan in balance and gave the lender’s inspector a clean reconciliation.
- 04
Early warning on the facade
A tracker for facade fabrication and installation flagged a six-week slip early enough to resequence interior work.
The outcome.
“The lender cares about one number: cost to complete. We made sure the developer always knew it before the lender asked.”
Owner’s representative, KonradBeck