Energy Infrastructure · 2026

On-Site Power Plant

Contemporaneous delay analysis that settled a multi-party time extension without arbitration.

Owner
Confidential
Location
U.S.
Market
Energy Infrastructure
Our role
Claims & delay analysis
Scale
120 MW
Completed
2026
The brief

Contemporaneous delay analysis that resolved a multi-party time extension request without going to arbitration.

The plant finished months after its contract date. The owner, the EPC contractor and an equipment supplier each blamed the others, and the time extension request ran to hundreds of pages. Liquidated damages and extended overhead claims were on the table. The parties were heading toward arbitration with very different stories about what happened.

How we controlled it

The approach.

  1. 01

    The record first

    We assembled schedule updates, daily reports, correspondence and delivery records into one verified project timeline.

  2. 02

    Windows analysis

    Using the contemporaneous schedule updates, a windows analysis traced how the critical path moved period by period.

  3. 03

    Delay allocated by cause

    Each delay was assigned to owner, contractor, supplier or concurrent cause, following AACE recommended practices.

  4. 04

    A clear story for the table

    Findings were presented in plain charts and a short report that all three parties could follow and test.

The outcome.

0Days in arbitration
3Parties to the settlement
14Schedule windows analyzed
11 wksFrom engagement to agreement

“Everyone had a version of events. The schedule updates had the facts. Once the parties saw the same evidence, the argument got short.”

Forensic scheduling lead, KonradBeck
Energy Infrastructure